Taguig, Philippines – CAVITEX C5 Link, one of the ongoing infrastructure projects of Metro Pacific Tollways Corporation (MPTC) through its subsidiary Cavitex Infrastructure Corporation is soon to service motorists with the opening of its first Segment  3A1in July. Spanning CP Garcia, Taguig to Sucat, Paranaque,  this 7.7 KM Tollroad is composed of 2 Segments which are Segment 2 that will traverse CAVITEX to Sucat and Segment 3 which will continue on to Sucat, Paranaque, Pasay, Las Pinas, crossing over SLEX and the Skyway At-Grade to CP Garcia Avenue, Taguig. It will have 3 interchanges namely the CAVITEX R1 interchange, the Sucat Interchange and the Merville Interchange. The project is estimated at 10B.

“We are fast tracking construction to be able to open the 2.2KM Segment 3A1 towards the end of July, to immediately alleviate congestion and enable motorists to easily cross from Merville, Paranaque to Taguig and vice versa. This alignment features the bridge that crosses over Skyway at-grade and SLEX and aimed to decongest Sales Road, as well as the East and West Service Roads. Said DPWH Secretary Mark Villar who led the ocular inspection by driving through the almost completed segment. “Vehicular traffic spends about 1.5hours just to cross from Villamor to Taguig via Fort Bonifacio. This section alone will help about 5,000 vehicles easily cross in under 3 minutes. ” Villar added.

“When completed, C5 South Link will seamlessly connect C5 and CAVITEX via Merville and Sucat. It will benefit about 50,000 cars in key areas of Metro Manila such as Makati, Taguig, Las Pinas, Pasay and Paranaque, as well as the roads of EDSA, Sales, East and West Service Roads. C5 South Link from CP Garcia, Taguig when connected to CAVITEX, Paranaque maybe traversed in under 10 minutes.” Said Bobby Bontia, President and General Manager of Cavitex Infrastructure Corporation.

MPTC is a subsidiary of Metro Pacific Investments Corporation (MPIC). Aside from the CAVITEX – CALAX network of toll roads, it holds in it’s portfolio of projects the NLEX, SCTEX, and current construction projects, Connector Road, and the Cebu-Cordova Link Expressway in Cebu.

 

How can we help you?

Toll Fee Matrix

 CAVITEXCAVITEX C5 LINK
Paranaque Toll PlazaKawit Toll PlazaMerville Toll PlazaTaguig Toll Plaza
CLASS 135.0073.0035.0035.00
CLASS 270.00146.0069.0069.00
CLASS 3104.00219.00104.00104.00
loader_animation